Gumusova - Gerede Highway

go back

Project Details

  • Name of Project
    Gumusova - Gerede Highway Phase 2 – Bolu Mountain Passage Project
  • Place of Project
    Bolu-Duzce
  • Employer
    Highways Administration
  • Contractor Company
    Astaldi SPA
  • Commencement and Completion Date
    1993 - 2007

Project Features

There are 4 viaducts at a length of 4,6 kilometers, 3 bridges at an approximate length of 900 meters and Bolu Mountain Tunnels at an approximate length of 2 thousand 900 meters at the Bolu Mountain passage which has a total length of 25,5 kilometers. Bolu Mountain Tunnels are built as double tube tunnels with 3 x 3 lane.

Details Of Cement Used In The Project

Approximately 1.000.000 tons of cement was used in the project.